- Interconnection & Transmission (WAPA)
- Want to move WAPA from 7 cents to 5 cents
- There is a need for an interconnection agreement with WAPA for current and future energy projects.
- WAPA approached CRIT regarding a Parker transmission upgrade from 161 kV to 230 kV.
- WAPA wants to remove transmission lines from Parker Dam to CRIT.
- This would require a jumper located on the reservation.
- WAPA is interested in leasing approximately 8 acres on the reservation to support this effort.
- Electric Vehicles
- A potential EV microgrid project
- Gas-sino (casino gas station)
- Infrastructure Priorities
- Energy infrastructure improvements.
- Internet connectivity upgrades, including broadband and fiber.
- Network & Broadband
- Long-term goal to build a Tribal Network Operations Center (NOC).
- Goal of improving interconnectivity with other Tribes, including Arizona and eastern California Tribes (over a dozen were mentioned).
- Interest in helping 22 Tribal ISPs achieve:
- Redundancy
- Improved latency
- Data centers are envisioned as part of this network strategy.
- Data Center Development
- Interest in developing state-of-the-art data centers that:
- Support broadband infrastructure
- Function as part of the broader network plan
- Concept includes:
- Ability to power up to a 1 GW data center
- Use of water for cooling
- Proximity to El Paso Natural Gas, which could support power needs
- Estimated 150 workers required
- Potential to source materials locally (from nearby mountains and rock sources)
- Exploring a joint venture model for data center development.
- Interest in developing state-of-the-art data centers that:
- Power Generation & Energy Planning
- Need for a developer and investor for a solar power generation project on undeveloped reservation land (~150,000 acres).
- Interest in establishing power purchase agreements (PPAs) to sell their energy production.
- Ongoing need for a jumper on the reservation tied to transmission and interconnection.
- Interest in developing a Tribal energy plan and energy policy.
- Exploring geothermal energy opportunities.
- Economic Development Projects
- Feasibility study underway for:
- A new casino and resort
- A potential EV microgrid project
- Specific sites/projects mentioned:
- Blue Water Resort and Casino
- Gas-sino (casino gas station)
- Feasibility study underway for:
- Utility, Water/Wastewater, and Regulatory Issues
- Interest in participating in or forming an Inter-Tribal Utility Authority.
- Water rights support needed:
- Tribe has a California allocation of 50,000 acre-feet of water
- A local water district currently takes all of this allocation
- Waste management development, modeled after Cabazon’s waste management facility.
- Need for IOU and CPUC regulatory support, including:
- Issues around California utility taxes on Tribal lands
- Agricultural waste and biodigesters to create energy