Colorado River Indian Tribes (CRIT)

Priorities List

*Last updated June 18, 2026

  1. Interconnection & Transmission (WAPA)
    1. Want to move WAPA from 7 cents to 5 cents
    2. There is a need for an interconnection agreement with WAPA for current and future energy projects.
    3. WAPA approached CRIT regarding a Parker transmission upgrade from 161 kV to 230 kV.
    4. WAPA wants to remove transmission lines from Parker Dam to CRIT.
    5. This would require a jumper located on the reservation.
    6. WAPA is interested in leasing approximately 8 acres on the reservation to support this effort.
  2. Electric Vehicles
    1. A potential EV microgrid project
    2. Gas-sino (casino gas station)
  3. Infrastructure Priorities
    1. Energy infrastructure improvements.
    2. Internet connectivity upgrades, including broadband and fiber.
  4. Network & Broadband
    1. Long-term goal to build a Tribal Network Operations Center (NOC).
    2. Goal of improving interconnectivity with other Tribes, including Arizona and eastern California Tribes (over a dozen were mentioned).
    3. Interest in helping 22 Tribal ISPs achieve:
      • Redundancy
      • Improved latency
    4. Data centers are envisioned as part of this network strategy.
  5. Data Center Development
    1. Interest in developing state-of-the-art data centers that:
      • Support broadband infrastructure
      • Function as part of the broader network plan
    2. Concept includes:
      • Ability to power up to a 1 GW data center
      • Use of water for cooling
      • Proximity to El Paso Natural Gas, which could support power needs
      • Estimated 150 workers required
      • Potential to source materials locally (from nearby mountains and rock sources)
    3. Exploring a joint venture model for data center development.
  6. Power Generation & Energy Planning
    1. Need for a developer and investor for a solar power generation project on undeveloped reservation land (~150,000 acres).
    2. Interest in establishing power purchase agreements (PPAs) to sell their energy production.
    3. Ongoing need for a jumper on the reservation tied to transmission and interconnection.
    4. Interest in developing a Tribal energy plan and energy policy.
    5. Exploring geothermal energy opportunities.
  7. Economic Development Projects
    1. Feasibility study underway for:
      • A new casino and resort
      • A potential EV microgrid project
    2. Specific sites/projects mentioned:
      • Blue Water Resort and Casino
      • Gas-sino (casino gas station)
  8. Utility, Water/Wastewater, and Regulatory Issues
    1. Interest in participating in or forming an Inter-Tribal Utility Authority.
    2. Water rights support needed:
      • Tribe has a California allocation of 50,000 acre-feet of water
      • A local water district currently takes all of this allocation
    3. Waste management development, modeled after Cabazon’s waste management facility.
    4. Need for IOU and CPUC regulatory support, including:
      • Issues around California utility taxes on Tribal lands
  9. Agricultural waste and biodigesters to create energy