- Increase housing on the reservation and increasing capacity to document a lack of housing through surveys and inspections.
- Energy efficiency and residential energy audits
- EV Chargers, Infrastructure + Fleet Planning, and Job Training
- Solar and EV master plan
- Provide affordable and resilient power to the Chemehuevi community
- Increase energy storage systems
- Back-up power and long duration energy storage
- Pumped hydro, previous talks with Department of Energy
- Microgrids, 5MW microgrid system to gain independence from SCE
- Large-scale power generation
- 2000 acres of solar – 200 MW
- Previous developer backed out
- Long distance to larger transmission (5-7 miles)
- Interconnection support
- Challenges with interconnection, rights of way/easements, CAISO, substation access
- Substation/Power station is on adjacent non-Tribal land
- The eservation has 1 main line that comes into the casino then through different roads and finally the housing community (which is on a loop system)
- Work with SCE to relocate lines
- Challenges with interconnection, rights of way/easements, CAISO, substation access
- Smaller-scale power generation
- A 30-50 acre solar grid system to connect to the casino to provide direct power reduction
- Increase energy storage systems
- Energy ordinance is established, but the Tribe is interested in a Tribal Utility
- WAPA credit allocations, Hoover Dam
- Previous BIA Tribal energy development and capacity grant
- A Joint Powers Agency with Chemehuevi (Tribal Power Exchange)
- This involves offloading directly with the casino and billing back at a 90% rate, allowing those funds to build an energy projects fund.
- Metropolitan Water District easement