Active
Clean Energy Workforce Development
Incentive

CALeVIP Fast Charge California Project 2 (FCCP-2) Incentives Window 2

Deadline:
January 14, 2027

Any timely submitted Tier 1 Application will be added to a funding queue for processing on a rolling, first-come, first-served basis.

Cyclical
Total Funding
$55,000,000
Maximum Award
Overview

The Fast Charge California Project 2 (FCCP-2) is the fourth incentive project under CALeVIP 2.0. The goal is to provide incentives for quick and efficient installations of high-powered DC fast chargers within California to help meet California’s ZEV goals. FCCP-2 provides incentives to applicants with qualified sites for the purchase and installation of eligible EV charging infrastructure equipment. This project benefits the residents of California by providing air pollution emission reductions through the provision of adequate infrastructure to support plug-in EV growth. The Center for Sustainable Energy (CSE) is implementing FCCP-2 through a partnership with the California Energy Commission (CEC).

Funder

Center for Sustainable Energy (CSE) for the California Energy Commission

Program

Fast Charge California Project 2 (FCCP-2)

Applications Due

January 14, 2027

Any timely submitted Tier 1 Application will be added to a funding queue for processing on a rolling, first-come, first-served basis.

Total Funding

For Window 2 and Window 3

Funding Source

State

Maximum Award

Award Details

Incentives cover up to 100% of eligible installation costs for DC fast chargers, up to $100,000 per charging port. Total approved costs may include equipment, installation, planning, engineering, etc.

Incentive Amounts:

  • $55,000 Incentive Cap per Charging Port for a 150 kW- 274.99 kW Guaranteed Output per charging port
  • $100,000 Incentive Cap per Charging Port for a 275 kW+ Guaranteed Output per charging port

 

 

Eligibility

Applicant must be both the incentive recipient and owner of the charging equipment. Applicants must have a minimum of 50% CCS connectors installed per site in order to be eligible for incentive funding. Eligible sites must be available to the public. Charging hubs, hotels, and business districts will no longer be eligible site types. All projects must abide by AB2061 data reporting requirements as dictated by the CEC.

Eligible Activities

Only Tier 1 Applications are eligible for funding in FCCP-2. Tier 1 “Ready to Build” required documents at application: Final Utility Service Design and Issued Permit.

Notable Requirements

FCCP-2 funding cannot be stacked/combined with other incentive funding to complete a Proposed Installation. If the Site is an active application with FCCP-2, the site cannot participate in any other EVSE incentive funding programs. The Same Single Legal Entity is prohibited from using the benefits of any other programs, including direct incentives or other benefits to pay any costs associated with Proposed Installations. See Implementation Manual pp. 28-30 for details.

Preferences

Disadvantaged communities (DACs) and low-income communities (LICs) are not required, but DAC/LIC and Tribal applications that meet ready-to-build requirements will be prioritized. See the Equipment Eligibility Criteria section in the Implementation Manual for specific criteria DC fast chargers must meet.

How to Apply

Navigate to the webpage for the FCCP-2 funding round at https://calevip.org/user/login to access the application process information and start the application online.

Application assistance will be made available to applicants via email and virtual office hours.

Economic DevelopmentEV InfrastructureSustainable TransportationTransportation Electrification

Technical Assistance Available

Subscribe for TECC updates

Thank you for your interest in the Tribal Energy and Climate Collaborative (TECC). Please enter the requested information below to receive news, event information, and other updates from TECC. 

Contact Information

Submit Your Feedback

Please share any technical issues, bugs, or functionality requests with us: